This project formed a critical part of the Etihad Rail Project Stage 2, Package 2D (C0308), involving the execution of road works and the diversion of utilities at key junctions (W, Y, and Z) near Chainage HJR 17+210 in Sharjah. The scope included earthwork, cutting, filling, road construction, and preparation for rail track integration to ensure safe and efficient rail corridor development. Executed under project reference C0308-CRCNPC-RGCC-CL-00104, the project was carried out by RGCC in collaboration with the CRCC-NPC JV, and under the direction of Etihad Rail. With a total value of AED 2,168,874.37, the project was successfully completed within the stipulated timeframe.